Why the Lean in Lean Six Sigma?

A free-wheeling mid-sized company ran smack up against the Sarbanes-Oxley Act a few months ago and found that it had to pause and take stock.[1] The company commissioned a small team to map out every place that financial data moved, and to no one’s surprise, it uncovered a lot of un-coordinated, manual processes. Next the team put into place some simple automation that managed inventory and financial data, an online order entry system, and even some automated human resources capabilities. The company found that with these more streamlined processes, days were cut out of order processing, inventories were reduced, and productivity was significantly improved.

The irony is that the fast-moving company had to slow down to speed up; more discipline led to higher speed. This is not an isolated case, there is a direct relationship between speed and discipline. Adding discipline should streamline a process, and streamlined processes don’t work without discipline.

When I first heard the term Lean Six Sigma, I wondered what Lean added to Six Sigma. I found that the answer is speed. The first principle of Lean Six Sigma is: Delight your customers with speed and quality. The second principle says: Improve process flow and speed. Lean Six Sigma emphasizes that speed is directly tied to excellence.

Speed is not the same thing as schedule. Schedule is about when something is supposed to get done, speed is about how fast it gets done. Speed has a bad reputation; it is often equated with hasty, undisciplined work. But if Lean Six Sigma has anything to teach us, it is that we should be looking for opportunities to streamline our core processes. This does not mean we should be compressing already tight schedules. It means that we first determine what our core processes are, and then focus on making them flow smoothly.

For example, core processes in software development would be naming conventions and coding standards, a configuration management system, an automated build process, a suite of automated unit tests that are built and maintained as part of the code, daily build/integrate/test cycles, acceptance testing integrated into the development process, and usability testing immediately after the features are implemented. Assuring that these disciplines are in place is fundamental to the smooth flow of any software development process.

However, the most important process to streamline in a development project is the knowledge-creating process. Whether we are developing a new product or a new software system, the fundamental thing we are doing is discovering what needs to be in the system in order to delight the customer. Lean thinking supports two basic disciplines for speeding up the knowledge creation process: short, frequent learning cycles and delayed commitment.

Short, frequent learning cycles are the antithesis of thorough front-end planning, but they are the best approach to processes which have the word ‘development’ in their title. In product development, for example, the typical process is to define requirements, choose a solution, refine the solution, and implement the solution. Although this process is common, it is not the best way to generate knowledge.

Toyota has a different approach, one that is much faster and delivers products of superior quality that consistently outsell the competition.[2] Toyota builds sets of possibilities to satisfy customer needs and then, through a series of combining and narrowing, the new product emerges. The combining and narrowing process is paced by timeboxed milestones that define stages of the narrowing process. Milestones are always met, despite the fact that there are no task breakouts or tracking. Decisions are delayed as long as possible, so that they can be based on the maximum amount of information.

When a project involves knowledge creation, rather than just knowledge replication, speed and quality come from improving the flow of creating knowledge. Many of our project management practices have a tendency to impede knowledge creation by forcing early choices and reducing the number of possibilities explored. This often leads us down bind alleys: after a lot of work has gone into a solution, we learn that it has a fatal flaw and we have to retrace our steps and repeat a whole lot of work.

The key to streamlining a development process is to clearly distinguish between true knowledge creating iterations and iterations that lead down blind alleys. Knowledge creating iterations explore multiple options and leave as many possibilities open as possible, delaying decisions until the last responsible moment.

Returning to our software development example, lean practices promote speed and flexibility by implementing core disciplines that promote change tolerance and allow decisions to be delayed as long as possible. Lean software development changes the focus from gathering requirements to encoding all requirements in tests. It introduces the concept of refactoring, that is, creating a simple design at the beginning of development to handle early requirements, and then improving the design later as more requirements are discovered. Finally, lean software development requires full testing and integration of code as soon as it is developed, on a daily basis at minimum. The result is easily maintainable code that has been designed to be flexible and built to be rapidly changed.

In lean software development, scope is not set at the beginning; small features sets are added based on priority determined by their ROI.[3] This tends to lead to a significant increase in both speed and productivity for a simple reason: most of the features we put into software systems are never going to be used. How can this be? When we freeze scope early, we encourage our customers, who don’t really know what they want, to ask for everything they can imagine. When we delay commitment on scope until we are well into the knowledge generating process, we end up reducing scope down to the minimum set that is really going to pay off.

If we’re not careful, Six Sigma might lead us to apply practices aimed at improving replication processes to knowledge generating processes. This often leads to slow, unresponsive, change-intolerant practices that are not appropriate for knowledge creation. Quite often the slow, deliberate nature of these practices is mistaken to be a sign of good discipline. But when we add Lean to Six Sigma, we discover that we need to re-think these slow processes, because we have come to understand that speed, discipline, and excellence go hand-in-hand.

References
[1] “Better Safe Than Sorry,” by Jeffrey Rothfeder, CIO Insight, February 2004

[2] Product Development for the Lean Enterprise, by Michael N. Kennedy, Oaklea Press, 2003.

[3] Software by Numbers, by Mark Denne and Jane Cleland-Huang, Prentice Hall, 2004

Screen Beans Art, © A Bit Better Corporation

Friday, 12 March 2004

Product Development for the Lean Enterprise (Book Review)

“How could a business book keep me up until 2:30 in the morning?” I wondered as I collapsed into bed. True, it was a business novel, so it had engaging characters, a hint of a plot, and actual villains. But that wasn’t what kept me reading into the wee hours of the morning. All through the book I kept applauding Michael Kennedy for doing such an excellent job of showing how to apply lean thinking to product development. “He gets it!” I kept saying to myself. “He understands that product development is a whole different ballgame than manufacturing.”

The book’s narrator is three weeks from retirement and coasting. His boss has just been asked to take over a flagging engineering department, and our narrator gets a week to assemble a swat team and figure out how to revamp the product development process. Buried deep in the organization is an engineer who has studied how Toyota does product development. We follow her as she first convinces the swat team and then the executives that they need to change the way they think about product development.

We learn that product development is a knowledge-creating process, and learn what that means: Entrepreneurial leadership, responsibility-based planning, expert workforce, and set-based concurrent engineering. Before you fall asleep, note that the novel format helps make these concepts come alive. The swat team has to digest a new paradigm for product development, and then sell it to an executive who has the mistaken notion that lean product development should be pretty much like lean manufacturing.

After the book convinces you that you can’t treat development like production, it goes on to describe in detail what does work for development in an understandable and practical way. I learned a lot about set-based design, and I really liked the description of responsibility-based planning and control.

The book ends with a ‘where do we go from here’ section, offering large group interventions as a way to trigger participative change. The book didn’t offer a lot of guidance on exactly what to do, but it does draw an interesting parallel between the desired new product development process and the change process itself.

Business novels, by their nature, provide ideas and examples, rather than specifics of how proceed in situations that differ from the ideal presented in the novel. But a well-written business novels such as this one provide good way to clarify important ideas in a quick-to-read, entertaining style. It’s easier to attack sacred cows in fiction, and easier help the reader visualize what might happen if a real paradigm shift takes place. If you liked Goldratt’s novel “The Goal” then you might stay up most of the night reading this book, just like I did.

Reference
Product Development for the Lean Enterprise by Michael N. Kennedy, Oakela Press, 2003.

Friday, 20 February 2004

Incremental Funding (Book Review)

The customer wanted an on-line currency exchange capability added to their on-line financial service offerings. They figured it would take several months to implement. But the development team suggested a different approach: start by hiring a dozen telephone operators and implement the necessary software for these folks to execute currency trades. The company gave it a try, and in six weeks the first iteration was ready. With no more than an 800 number on their web site and a rudimentary interface to the currency market, new business was being transacted and profits being made.

Over the course of the next several months, the on-line trading capability was implemented around the core module originally used by the telephone operators. Not only did the company see early revenue, but the risk of failure disappeared once trading started. In addition, system requirements were defined by observing real trades.

In the book Software by Numbers – Low Risk, High Return Development (Prentice Hall, 2004) Mark Denne and Jane Cleland-Huang make the case for incremental delivery of software. Mark Denne developed the Incremental Funding Methodology (IFM) in the 1990’s to help land a large software development contract. In an attempt to distinguish his bid from the pack, he reorganized the deliveries into units of value, and adjusted the development sequence so that the customer would realize revenue faster and in the end, receive a greater return on their investment. The customer discovered that this approach dramatically reduced their need to borrow money and gave them earlier product release with lowered risk. In what seemed like hotly competitive bidding process, Mark’s company won the bid by emphasizing “time to value” instead of development efficiency.

Software by Numbers recommends dividing a project into Minimum Marketable Features (MMF’s). These are small feature sets which deliver some identifiable value to the customer. Each MMF should have its own return on investment (ROI). By laying out the potential ROI’s of various feature sets, an optimal development sequence for the MMF’s can be determined. Early deployment of key MMF’s reduces risk while generating revenue to help fund the remainder of the project.

When business people and software developers focus on identifying and valuing marketable features, their conversation is changed. Developers are exposed to ROI and stakeholders are confronted with the realities of software development. The entire team is focused on achieving business ROI early in the development cycle. Management sees continuously measurable progress, and the team benefits from the early and compelling feedback generated by real software being used in production.

With so many benefits, why wouldn’t IFM be the preferred approach for developing software? Denne and Cleland-Huang note that many practitioners view software architecture as a monolithic whole, requiring early definition because of the extensive impact that architectural changes can have on a system. On the other hand, they argue, it is not until the details of an architecture are implemented that one can tell if the architecture is viable. Thus architecture presents us with a chicken and egg problem.

The book recommends that architectural elements which support each set of MMF’s should be developed with their respective MMF’s. In other words, architectural development should be sequenced using the same financially driven priorities as feature development. While there may be times where architectural coherency may dictate early development of features not immediately related to the current feature set, in general it is not only possible but also preferable to defer implementation of architectural elements until the features requiring these elements is being developed.

As we discover that architecture not only can evolve, but in fact, in any deployed system, the architecture will evolve over time, the view that architecture must be fixed early in the development process becomes a liability. This is a view that creates architectures that are not tolerant of the change they inevitably must undergo. Once we accept that software architectures must be designed to be change-tolerant, the barrier to early deployment of high value features is lowered.

Returning to the currency trading example, we see that early deployment of marketable features is a compelling strategy for increasing return and reducing risk. At the same time the stage is set for a better understanding of the real system requirements and improved collaboration between developers and their customers.

Reference
Software by Numbers: Low-Risk, High-Return Development by Mark Denne, Jane Cleland-Huang, Prentice Hall, 2004

Screen Beans Art, © A Bit Better Corporation

Sunday, 1 February 2004

Toward A New Definition of Maturity

In the mid 90's, a company named Zeos assembled PC's in my home state of Minnesota. I was impressed when Zeos was named as a finalist for the Malcolm Baldrige Award, because competing for this quality award is more or less the equivalent of a software company trying to reach CMM Level 5. At the same time that Zeos was focusing on the Malcolm Baldrige Award, a similar company in Austin, Texas, called Dell Computer, was focusing all of its energy on two rather different objectives: 1) keep inventory as low as possible, because it is the biggest risk in the PC assembly business, and 2) deliver computers just as fast as possible after customers decide what they want. Dell could not possibly meet these goals unless it had the key Malcolm Baldrige capabilities in place, but that was not its focus. On the other hand, in order to be a finalist, Zeos had to spend huge amounts of executive and management attention on Malcolm Baldrige activities. So which of these two companies would you call the most mature?

A company does not rise to the top of its industry by perfecting its normative procedures. While General Motors was busy refining it’s four phase process for product development, Toyota and Honda were developing cars in something approaching half the time, for half the cost. The resulting cars were less expensive to produce and captured a much larger market share. Yet when looked at through Detroit’s eyes, the development approach of the Japanese companies was decidedly immature – why, they even let die makers start cutting dies long before the final drawings were released!

The problem with maturity models is that they foster a mental model of ‘good practice’ that can block out paradigm shifts that are destined to reshape the industry. This has happened in manufacturing. It has happened in product development. Can it be happening in software development today?

Why Do We Do This To Ourselves?
We human beings a tendency to decompose complex problems into smaller pieces, and then focus on the individual pieces, often, unwittingly, at the expense of the whole. One reason for this is that people can only hold a few chunks of information in short term memory at once; Miller’s law claims that this number is seven plus or minus two. Thus we have a strong tendency to take concepts which we cannot get our minds around and decompose them into parts, so we can deal with one part at a time. There is nothing wrong with our very natural tendency to decompose problems, except that we often forget to reconfigure the parts into a whole and take their interactions into account.

The problem is, decomposition only works if the whole is indeed equal to the sum of its parts, and interactions between the parts can be ignored. In practice, this is rarely the case; in fact, optimization of the parts has a tendency to sub-optimize the whole. For example, a manager might think that the best way to run a testing department is to make sure that every single person is working all of the time. In order to guarantee maximum productivity of each individual, he makes sure there is always a pile of testing waiting to be done. Down the hall, the operations manager knows better. She knows that if she runs the servers at high utilization, the entire system bogs down, just like rush hour traffic. If only the testing manager would realize that his policy of full utilization of testing resources creates the same kind of traffic jam in software development!

Decomposition of a problem into pieces is a standard problem solving heuristic, but it needs to be accompanied by regular aggregation of the parts into a whole. It is here that iterative development shines, because it forces us to develop, test, integrate, and release complete threads of the system early and often. Thus we reset our view of the big picture every iteration. However, iterative development requires that we decompose the problem space along dimensions that are orthogonal to those traditionally recommended. Instead of decomposing the problem into requirements, analysis, design, programming, testing, integration, deployment, we decompose the problem into features along the natural fault lines of the domain.

Decomposition vs. Abstraction
There is an alternative to the decomposition of a problem into components, and that is to abstract the problem to a higher level, rather than decompose it to a lower level. The result is the same in both cases – you have reduced the number of things you need to think about to 7 +/- 2. But when you move the problem up to a higher level of abstraction, the interaction of the parts is maintained, so abstractions would seem to be the better approach to solving complex problems.

There is a catch: people can’t create abstractions without understanding the domain, because correct abstractions require that the abstractor knows what is important, what fits together naturally, and where to find the natural joints or fault lines of the domain. For this reason, experts in the domain have a greater tendency to abstract to a higher level, while those who are not familiar with the domain tend to decompose the problem, and that decomposition will probably not be along the natural fault lines of the domain.

It is when we decompose a problem in a manner which does not fit the domain, and then drill down to the details too fast, that important things get missed. We would like to think that a lot of early detail will help us find all the hidden gremlins that might bite us later. This is only true if those gremlins are actually inside the areas we investigate – but the tough problems usually lurk between the cracks in our thinking. Unfortunately we only discover those problems when we integrate the pieces together at the end, and by that time we have invested so much in the details that change is very difficult.

It is safer to work from a higher level or abstraction, but this means we don’t drill down to detail right away. We take a breadth-first approach, keep options open and gradually fill in the details. With this approach we are more likely to find those gremlins while we still can do something about them, but some people might think that we don’t have a plan, aren’t tracking the project, and can’t manage requirements.

Assessment Rather than Certification
Quite frequently CMM is implemented as a certification process, decomposing ‘mature’ into separately verifiable capabilities. The danger is that we may lose sight of forest for the trees. For example, focusing on requirements management can be detrimental to giving users what they really want. Focusing on quality assurance separate from development can destroy the integrating effect of developers and testers working side-by-side every day. Focusing on planning as a predictive process can keep us from using planning as an organizing process.

A better approach to discovering the underlying competence of an organization is to use an assessment process rather than a certification process. Assessments present challenging situations that cannot be dealt with unless a host of capabilities are in place; if the challenge is properly handled, the presence of these capabilities can be inferred. For example, a pilot’s ability to fly a plane can be assessed by observing how the pilot lands a plane in a stiff cross wind.

Consider your hiring process. When a candidate lists Microsoft or PMI certifications, you take that into account, but you are really looking for a track record of success which demonstrates that the certifications were put to good use. One software company I know administers a one hour logic tests to job applicants, a test without a line of code in it. Yet the test does an admirable job of assessing the capability of the candidate to think like a good developer.

Measure UP
If we accept that we get what we measure then, as Rob Austin points out in “Measuring and Managing Performance in Organizations,” we do not get what we don’t measure. If we are not measuring everything, if something important just didn’t make it into our measurement system, then we are not going to get it. To counter this problem, we have a tendency to pile one measurement on top of another, every time we discover that we forgot to measure something. In CMM, for example, each KPA addresses something that caused a failure of some software project somewhere. As people discovered new ways for software projects to fail, a KPA’s was added to address the new failure mode. Nevertheless, all of those KPA’s still don’t cover everything that could go wrong, although they certainly try.

Once we admit that we just can’t measure everything, then we are ready to move to assessment-style measurements rather than a certification-style measurements. For example, in project management, we decompose the measurement system into cost, schedule, scope and defects, and we try hard to make these measurements work because we think they are the measurements we should use. But no matter how hard we try, we are often unsuccessful in measuring true business value by totaling up the yardsticks of cost, schedule, scope and defects.

What if we just measured business value instead of cost, schedule, scope, and defects? When I was developing new products at 3M, we did not pay much attention to cost, schedule and scope. Instead we developed a P&L which we would use to check out the impact of a late introduction date or a lower unit cost. The development team tried to optimize the overall P&L, not any one dimension. It may seem strange that a project team would concern itself with the financial model of the business, but I assure you it is far better decision-support tool than cost, schedule and scope.

The Measure of Maturity
I believe that our industry could use a simpler measurement of software development maturity, one that is not subject to the dangers of decomposition and does not attempt to defy Miller’s Law with a long lists of things to think about. I propose that we use a measurement that has been successfully used in countless organizations, and has proven to be a true indicator of the presence of the kind of capabilities measured by CMM. To introduce this measurement, let’s go back to Dell and see what it measured:
  1. The level of inventory throughout the entire system, and
  2. The speed with which the organization can repeatedly and reliably respond to a customer request.
Okay, you say, fine for manufacturing, but software development is different.

True, I counter, but these measurements still work.

The level of inventory in your system is the amount of stuff you have under development. The more inventory of unfinished development work you have sitting around, the more you are at risk of it growing obsolete, getting lost, and hiding defects. If you capitalized it, you also bear the risk of having to write it off if it doesn’t work. The less of that kind of stuff you have on hand, the better off you will be.

The speed with which you can responds to a customer is directly proportional to the amount of unfinished development work you have clogging up your system. In truth, the two measurements above are one and the same – you can deliver faster if your system is not clogged with unfinished work. But more to the point, you cannot reliably and repeatedly deliver fast if you do not have a mature organization. You need version control, built-in quality, ways to gather requirements fast and routinely translate them correctly into code. You need everything you measure in CMM, and you need all of those capabilities working together as an integrated whole. In short, the speed with which you can repeatedly and reliably deliver on customers requests is a better measure of the maturity of your software development organization.


Screen Beans Art, © A Bit Better Corporation

Thursday, 20 November 2003

Software Development Productivity

Productivity is the prime determinant of our standard of living. If the revenue generated per work hour goes up, income levels rise. If productivity lags, wages also decline. When all else is equal in a market, the more productive company will enjoy greater profits. Thus the key to sustaining and increasing wages in the software development industry is year-to-year improvements in software development productivity.

Over the decade of the 1990’s, productivity increases in the technology sector resulted largely from increased capability of the underlying technology and intense customer demand for new technology. In recent years, however, software development productivity has stagnated as the demand for newer, faster technology has flattened. Thus it should come as no surprise that wages in the software development profession have flattened or declined. In order for the software development industry to see rising incomes, year-to-year increases in software development productivity must be generated.

As the technology sector matures, it can no longer depend on increasing growth in the underlying technology to fuel productivity increases. The time has come for serious efforts to increase productivity through more efficient use of labor and more effective value propositions for customers. This is how more mature economic sectors have been increasing productivity for decades.

But first we need to define what we mean by productivity improvement in the software development industry. Traditionally, we have measured productivity as thousand lines of code (kloc) per labor hour. However, the key process of a development activity is the transformation ideas of into products. To measure the real productivity of software development, we need look at how efficiently and effectively we turn ideas into software. So perhaps we should start with a new definition of software development productivity:
  • For companies that develop and sell software as a product, productivity may be defined as the revenue generated per employee.
  • For internal IT organizations, productivity may be defined as increased revenue realized by the supported business per dollar spent by the IT organization [1]
There are three basic approaches to productivity improvement:
  1. Reduce product costs by eliminating investments in product features that customers do not find valuable.
  2. Reduce indirect costs by streamlining processes and eliminating inefficiencies in development, delivery and support.
  3. Increase revenue by adding more value to a product so customers will pay more for it.
Let’s explore each of these approaches to improving software development productivity.
1. Reduce Software Development Effort.
About two-thirds of the features of a typical software system are seldom or never used. Only twenty percent of the features are used frequently. [2]  Eliminating extra features that no one really wants represents the single largest opportunity for increasing software development productivity in most organizations.
Extra features are generated by a software development process that attempts to nail down the features in a system at the beginning of the development process. Typically, customers are asked to decide at the start of a project what features they want. Often they have little incentive to keep the features list short, but they are penalized if the forget to include something. Can there be any wonder that a feature list generated with such incentives contains far more features than are really necessary?
The biggest opportunity for reducing software development effort is to limit overproduction of features by developing features on an as-needed basis. For many companies, this may require a paradigm shift in architecture and design. However, it is becoming increasingly apparent that there are many disciplined approaches to software development that provide for an emergent architecture. Key approaches include:
  • Automated test harnesses developed at the same time as the underlying code
  • Refactoring the code on an on-going basis to keep its design simple and clean
2. Streamline the Development Processes.
The measure of maturity of an organization is the speed at which it can reliably and repeatedly execute it’s key processes. A mature software development organization is one that can rapidly, reliably and reliably translate customer needs into deployed code. Too often, rapid software development has been equated with sloppy work, so attempts to streamline the development process are often looked upon with suspicion. However, in industry after industry, when sequential development processes are replaced with concurrent development processes, costs are slashed, quality is improved, and development time is dramatically reduced.
Organizations which record year-on-year productivity improvements spend a lot of time focusing on streamlining key processes while increasing their reliability. They do this by focusing on the flow of value through the process. There are three main techniques used to do this:
  • Value stream mapping is a tried and true approach to streamlining value-creating processes. A value stream map of the current state is invaluable for spotting waste; a value stream map of the desired future state is a roadmap for process improvement. Poppendieck.LLC helps organizations use value stream mapping to improve software development productivity.
  • Kaizen events are a typical implementation vehicle for streamlining operational processes. In software development, a modification of Kaizen events is usually required, because software improvement efforts usually take more time than is generally allocated for Kaizen events. We facilitate effective Kaizen events for software development.
  • An Integrated Product Team (IPT) is frequently used to facilitate information flow across an entire development team. Software development IPT’s involve not only architects, designers and developers, but also those responsible for deployment, operations, customer support, and maintenance.
3. Increase Customer Value.
Understanding customer value well enough to obtain additional revenue is the third key to increasing software development productivity. In general, customers cannot be relied upon to tell a software development organization how to increase the value of its offerings. In fact, customers generally think of software as a tool that should adapt to their needs over time. This makes understanding customer value elusive not only during a software development project, but even after deployment. And yet, the price that can be charged for software is directly related to understating how to increase its value proposition.
We are not likely to increase software’s value proposition unless we increase our understanding how customers might use our software to create value for themselves. There are three steps to increasing customer value:
  • Iterative development with frequent releases creates a short feedback loop between customers and developers. The key to successful iterative development is to prioritize the feature list, implement features in order of business value, and deploy them as soon as possible. The short feedback loop created by iterative development and early deployment not only limits the development of unnecessary code, it brings to light innovative new uses of technology that can significantly improve business results.
  • The next step to understanding customer value is to understand how our customers create value for their customers. Increasing the support of key value creating processes for customers is the most likely source of increased revenue for software development. One method of discovering how our customers create value is to focus on their key processes and map their value stream.
  • The final step to providing customer value is to link organizations through partnerships that focus on the overall productivity of the combined enterprise. Peter Drucker noted in Management Challenge for the 21st Century [3] that “In every single case…the integration into one management system of enterprises that are linked economically rather than controlled legally, has given a cost advantage of at least 25 percent and more often 30 percent.” The bottom line is that when organizations work together for their mutual benefit rather than optimizing the results of the individual organizations, a large increase in overall productivity can be realized.
Software development organizations have always emphasized process; however, the focus has been on predictable delivery of pre-defined scope rather than increased productivity. Not surprisingly, processes which did not value productivity did not deliver productivity increases; quite often they decreased productivity instead. We need to move from processes which define scope early to processes which allow only the most valuable scope to be addressed. We need to move from slow processes with many wasteful steps to streamlined processes which eliminate non-value-adding activities. We need to focus on increasing revenue potential over cutting costs by discovering how we can help our customers increase their productivity.
____________________
References and Notes
[1] Productivity for internal IT organizations may be also defined as increased revenue realized by the supported business per employee in the IT organization, but such a definition would ignore make-vs-buy decisions, not to mention outsourcing.

[2] Johnson, Jim, Chairman of The Standish Group, ‘ROI, It’s Your Job,’ Keynote: Third International Conference on Extreme Programming, Alghero, Italy, May, 26-29, 2002

[3] Management Challenge for the 21st Century, Peter Drucker, Harper Business, 2001, p 33.

Friday, 1 August 2003

Concurrent Development

When sheet metal is formed into a car body, a massive machine called a stamping machine presses the metal into shape. The stamping machine has a huge metal tool called a die which makes contact with the sheet metal and presses it into the shape of a fender or a door or a hood. Designing and cutting these dies to the proper shape accounts for half of the capital investment of a new car development program, and drives the critical path. If a mistake ruins a die, the entire development program suffers a huge set-back. So if there is one thing that automakers want to do right, it is the die design and cutting.

The problem is, as the car development progresses, engineers keep making changes to the car, and these find their way to the die design. No matter how hard the engineers try to freeze the design, they are not able to do so. In Detroit in the 1980’s the cost of changes to the design was 30 – 50% of the total die cost, while in Japan it was 10 – 20% of the total die cost. These numbers seem to indicate the Japanese companies must have been much better at preventing change after the die specs were released to the tool and die shop. But such was not the case.

The US strategy for making a die was to wait until the design specs were frozen, and then send the final design to the tool and die maker, which triggered the process of ordering the block of steel and cutting it. Any changes went through a arduous change approval process. It took about two years from ordering the steel to the time that die would be used in production. In Japan, however, the tool and die makers order up the steel blocks and start rough cutting at the same time the car design is starting. This is called concurrent development. How can it possibly work?

The die engineers in Japan are expected to know a lot about what a die for a front door panel will involve, and they are in constant communication with the body engineer. They anticipate the final solution and they are also skilled in techniques to make minor changes late in development, such as leaving more material where changes are likely. Most of the time die engineers are able to accommodate the engineering design as it evolves. In the rare case of a mistake, a new die can be cut much faster because the whole process is streamlined.

Japanese automakers do not freeze design points until late in the development process, allowing most changes occur while the window for change is still open. When compared to the early design freeze practices in the US in the 1980’s, Japanese die makers spent perhaps a third as much money on changes, and produced better die designs. Japanese dies tended to require fewer stamping cycles per part, creating significant production savings.

The significant difference in time-to-market and increasing market success of Japanese automakers prompted US automotive companies to adopt concurrent development practices in the 1990’s, and today the product development performance gap has narrowed significantly.

Concurrent Software Development
Programming is a lot like die cutting. The stakes are often high and mistakes can be costly, so sequential development, that is, establishing requirements before development begins, is commonly thought of as a way to protect against serious errors. The problem with sequential development is that it forces designers to take a depth-first rather than a breadth-first approach to design. Depth-first forces making low level dependant decisions before experiencing the consequences of the high level decisions. The most costly mistakes are made by forgetting to consider something important at the beginning. The easiest way to make such a big mistake is to drill down to detail too fast. Once you set down the detailed path, you can’t back up, and aren’t likely to realize that you should. When big mistakes can be made, it is best to survey the landscape and delay the detailed decisions.

Concurrent development of software usually takes the form of iterative development. It is the preferred approach when the stakes are high and the understanding of the problem is evolving. Concurrent development allows you to take a breadth-first approach and discover those big, costly problems before it’s too late. Moving from sequential development to concurrent development means starting programming the highest value features as soon as a high level conceptual design is determined, even while detailed requirements are being investigated. This may sound counterintuitive, but think of it as an exploratory approach which permits you to learn by trying a variety of options before you lock in on a direction that constrains implementation of less important features.

In addition to providing insurance against costly mistakes, concurrent development is the best way to deal with changing requirements, because not only are the big decisions deferred while you consider all the options, but the little decisions are deferred as well. When change is inevitable, concurrent development reduces delivery time and overall cost, while improving the performance of the final product.

If this sounds like magic – or hacking – it would be if nothing else changed. Just starting programming earlier, without the associated expertise and collaboration found in Japanese die cutting, is unlikely to lead to improved results. There are some critical skills that must be in place in order for concurrent development to work.

Under sequential development, US automakers considered die engineers to be quite remote from the automotive engineers, and so too, programmers in a sequential development process often have little contact with the customers and users who have requirements and the analysts who collect requirements. Concurrent development in die cutting required US automakers to make two critical changes – the die engineer needed the expertise to anticipate what the emerging design would need in the cut steel, and had to collaborate closely with the body engineer.

Similarly, concurrent software development requires developers with enough expertise in the domain to anticipate where the emerging design is likely to lead, and close collaboration with the customers and analysts who are designing how the system will solve the business problem at hand.

The Last Responsible Moment
Concurrent software development means starting developing when only partial requirements are known and developing in short iterations which provide the feedback that causes the system to emerge. Concurrent development makes it possible to delay commitment until the Last Responsible Moment, that is, the moment at which failing to make a decision eliminates an important alternative. If commitments are delayed beyond the Last Responsible Moment, then decisions are made by default, which is generally not a good approach to making decisions.

Procrastinating is not the same as making decisions at the Last Responsible Moment; in fact, delaying decisions is hard work. Here are some tactics for making decisions at the Last Responsible Moment:

  • Share partially complete design information. The notion that a design must be complete before it is released is the biggest enemy of concurrent development. Requiring complete information before releasing a design increases the length of the feedback loop in the design process and causes irreversible decisions to be made far sooner than necessary. Good design is a discovery process, done through short, repeated exploratory cycles.

  • Organize for direct, worker-to-worker collaboration.  Early release of incomplete information means that the design will be refined as development proceeds. This requires that upstream people who understand the details of what the system must do to provide value must communicate directly with downstream people who understand the details of how the code works.

  • Develop a sense of how to absorb changes.  In ‘Delaying Commitment,’ IEEE Software (1988), Harold Thimbleby observes that the difference between amateurs and experts is that experts know how to delay commitments and how to conceal their errors for as long as possible. Experts repair their errors before they cause problems. Amateurs try to get everything right the first time and so overload their problem solving capacity that they end up committing early to wrong decisions. Thimbleby recommends some tactics for delaying commitment in software development, which could be summarized as an endorsement of object-oriented design and component-based development:

  • Use Modules.  Information hiding, or more generally behavior hiding, is the foundation of object-oriented approaches. Delay commitment to the internal design of the module until the requirements of the clients on the interfaces stabilize. 

  • Use Interfaces. Separate interfaces from implementations. Clients should not de-pend on implementation decisions.

  • Use Parameters.Make magic numbers – constants that have meaning – into parameters. Make magic capabilities like databases and third party middleware into parameters. By passing capabilities into modules wrapped in simple interfaces, your dependence on specific implementations is eliminated and testing becomes much easier.

  • Use Abstractions.  Abstraction and commitment are inverse processes. Defer commitment to specific representations as long as the abstract will serve immediate design needs.

  • Avoid Sequential Programming.  Use declarative programming rather than procedural programming, trading off performance for flexibility. Define algorithms in a way that does not depend on a particular order of execution.

  • Beware of custom tool building.  Investment in frameworks and other tooling frequently requires committing too early to implementation details that end up adding needless complexity and seldom pay back. Frameworks should be extracted from a collection of successful implementations, not built on speculation.

Additional tactics for delaying commitment include:
  • Avoid Repetition. This is variously known as the Don’t Repeat Yourself (DRY) or Once And Only Once (OAOO) principle. If every capability is expressed in only one place in the code, there will be only one place to change when that capability needs to evolve and there will be no inconsistencies.

  • Separate Concerns.  Each module should have a single well defined responsibility. This means that a class will have only one reason to change. 

  • Encapsulate Variation. What is likely to change should be inside, the interfaces should be stable. Changes should not cascade to other modules. This strategy, of course, depends on a deep understanding of the domain to know which aspects will be stable and which variable. By application of appropriate patterns, it should be possible to extend the encapsulated behavior without modifying the code itself. 

  • Defer Implementation of Future Capabilities. Implement only the simplest code that will satisfy immediate needs rather than putting in capabilities you ‘know’ you will need in the future. You will know better in the future what you really need then and simple code will be easier to extend then if necessary.

  • Avoid extra features. If you defer adding features you ‘know’ you will need, then you certainly want to avoid adding extra features ‘just-in-case’ they are needed. Extra features add an extra burden of code to be tested and maintained, and understood by programmers and users alike. Extra features add complexity, not flexibility.

Much has been written on these delaying tactics, so they will not be covered in detail in this book.
  • Develop a sense of what is critically important in the domain.  Forgetting some critical feature of the system until too late is the fear which drives sequential development. If security, or response time, or fail safe operation are critically important in the domain, these issues need to be considered from the start; if they are ignored until too late, it will indeed be costly. However, the assumption that sequential development is the best way to discover these critical features is flawed. In practice, early commitments are more likely to overlook such critical elements than late commitments, because early commitments rapidly narrow the field of view.

  • Develop a sense of when decisions must be made.  You do not want to make decisions by default, or you have not delayed them. Certain architectural concepts such as usability design, layering and component packaging are best made early, so as to facilitate emergence in the rest of the design. A bias toward late commitment must not degenerate into a bias toward no commitment. You need to develop a keen sense of timing and a mechanism to cause decisions to be made when their time has come.

  • Develop a quick response capability. The slower you respond, the earlier you have to make decisions. Dell, for instance, can assemble computers in less than a week, so they can decide what to make less than a week before shipping. Most other computer manufacturers take a lot longer to assemble computers, so they have to decide what to make much sooner. If you can change your software quickly, you can wait to make a change until customers’ know what they want.

Cost Escalation
Software is different from most products in that software systems are expected to be upgraded on a regular basis. On the average, more than half of the development work that occurs on a software system occurs after it is first sold or placed into production. In addition to internal changes, software systems are subject to a changing environment – a new operating system, a change in the underlying database, a change in the client used by the GUI, a new application using the same database, etc. Most software is expected to change regularly over its lifetime, and in fact once upgrades are stopped, software is often nearing the end of its useful life. This presents us with a new category of waste, that is, waste caused by software that is difficult to change.

In 1987 Barry Boehm wrote, “Finding and fixing a software problem after delivery costs 100 times more than finding and fixing the problem in early design phases”. This observation became been the rational behind thorough up front requirements analysis and design, even though Boehm himself encouraged incremental development over “single-shot, full product development.” In 2001, Boehm noted that for small systems the escalation factor can be more like 5:1 than 100:1; and even on large systems, good architectural practices can significantly reduce the cost of change by confining features that are likely to change to small, well-encapsulated areas.

There used to be a similar, but more dramatic, cost escalation factor for product development. It was once estimated that a change after production began could cost 1000 times more than if the change had been made in the original design. The belief that the cost of change escalates as development proceeds contributed greatly to the standardizing the sequential development process in the US. No one seemed to recognize that the sequential process could actually be the cause of the high escalation ratio. However, as concurrent development replaced sequential development in the US in the 1990’s, the cost escalation discussion was forever altered. The discussion was no longer how much a change might cost later in development; the discussion centered on how to reduce the need for change through concurrent engineering.

Not all change is equal. There are a few basic architectural decisions that you need to get right at the beginning of development, because they fix the constraints of the system for its life. Examples of these may be choice of language, architectural layering decisions, or the choice to interact with an existing database also used by other applications. These kinds of decisions might have the 100:1 cost escalation ratio. Because these decisions are so crucial, you should focus on minimizing the number of these high stakes constraints. You also want to take a breadth-first approach to these high stakes decisions.

The bulk of the change in a system does not have to have a high cost escalation factor; it is the sequential approach that causes the cost of most changes to escalate exponentially as you move through development. Sequential development emphasizes getting all the decisions made as early as possible, so the cost of all changes is the same – very high. Concurrent design defers decisions as late as possible. This has four effects:
  • Reduces the number of high-stake constraints.

  • Gives a breadth-first approach to high-stakes decisions, making it more likely that they will be made correctly.

  • Defers the bulk of the decisions, significantly reducing the need for change.

  • Dramatically decreases the cost escalation factor for most changes.

A single cost escalation factor or curve is misleading. Instead of a chart showing a single trend for all changes, a more appropriate graph has at least two cost escalation curves, as show in Figure 3-1. The agile development objective is to move as many changes as possible from the top curve to the bottom curve.




Figure 3-1. Two Cost Escalation Curves
Returning for a moment to the Toyota die cutting example, the die engineer sees the conceptual design of the car and knows roughly the size of door panel is necessary. With that information, a big enough steel block can be ordered. If the concept of the car changes from a small, sporty car to a mid-size family car, the block of steel may be too small, and that would be a costly mistake. But the die engineer knows that once the overall concept is approved, it won’t change, so the steel can be safely ordered, long before the details of the door emerge. Concurrent design is a robust design process because the die adapts to whatever design emerges.

Lean software development delays freezing all design decisions as long as possible, because it is easier to change a decision that hasn’t been made. Lean software development emphasizes developing a robust, change-tolerant design, one that accepts the inevitability of change and structures the system so that it can be readily adapted to the most likely kinds of changes.

The main reason why software changes throughout its lifecycle is that the business process in which it is used evolves over time. Some domains evolve faster than others, and some domains may be essentially stable. It is not possible to build in flexibility to accommodate arbitrary changes cheaply. The idea is to build tolerance for change into the system along domain dimensions that are likely to change. Observing where the changes occur during iterative development gives a good indication of where the system is likely to need flexibility in the future. If changes of certain types are frequent during development, you can expect that these types of changes will not end when the product is released. The secret is to know enough about the domain to maintain flexibility, yet avoid making things any more complex than they must be.

If a system is developed by allowing the design to emerge through iterations, the design will be robust, adapting more readily to types of changes that occur during development. More importantly, the ability to adapt will be built-in to the system, so that as more changes occur after its release, they can be readily incorporated. On the other hand, if systems are built with a focus on getting everything right at the beginning in order to reduce the cost of later changes, their design is likely to be brittle and not accept changes readily. Worse, the chance of making a major mistake in the key structural decisions is increased with a depth-first, rather than a breadth-first approach.

Friday, 25 April 2003

Lean Software Development

I often hear developers say: Life would be so much easier if customers would just stop changing their minds. In fact, there is a very easy way to keep customers from changing their minds – give them what they ask for so fast that they don’t have the time to change their minds.

When you order something on-line, it’s usually shipped before you have time for second thoughts. Because it ships so fast, you can wait until you’re sure of what you want before you order. But once you place the order, you have very little time to change your mind.

The idea behind lean thinking is exactly this: Let customers delay their decisions about exactly what they want as long as possible, and when they ask for something, give it to them so fast they don’t have time to change their minds.

Sure, you say, this is fine for Amazon.com, but how does it relate to software development? The way to deliver things rapidly is to deliver them in small packages. The bigger the increment of functionality you try to deliver, the longer it takes to decide what is needed and then get it developed, tested, and deployed. Maintenance programmers have known this for years. When a piece of production code breaks, they find the cause, create a patch, test it rigorously, and release it to production – usually in the space of a few hours or days.

But, you say, development is different; we need to develop a large system, we need a design, and we can’t deploy the system piecemeal. Even large systems that have to be deployed all-at-once should be developed in small increments. True, design is needed, but there is scant proof that great designs are achieved by meticulously gathering detailed requirements and analyzing them to death. Great designs come from great designers, and great designers understand that designs emerge as they develop a growing understanding of the problem.

As Harold Thimbleby said in Delaying Commitment [1], “In many disciplines, the difference between amateurs and experts seems to be that experts know how to delay their commitments…. Amateurs, on the other hand, try to get things completely right the first time and often fail… in their anxious desire to avoid error, they make early commitments – often the wrong ones… In fact, the expert’s strategy of postponing firm decisions, discovering constraints, and then filling in the details is a standard heuristic to solve problems.”

Lean Thinking
Over the last two decades, Lean Thinking has created fundamental transformations in the way we organize manufacturing, logistics, and product development. For example, concurrent development has replaced sequential development in industries from airlines to automobiles, cutting product development time by perhaps a third and development cost in half, while improving the quality and timeliness of the product. There are those who think that rapid development is equivalent to shoddy work, but lean organizations have demonstrated quite the opposite. The measure of the maturity of an organization is the speed with which it can reliably and repeatedly respond to a customer request.

Yes, you heard that right. Maturity is not measured by the comprehensiveness of process documentation or the ability to make detailed plans and follow them. It is measured by operational excellence, and the key indicator of operational excellence is the speed with which the organization can reliably and repeatedly serve its customers. Thirty years ago, Frederick W. Smith, the founder of FedEx, envisioned an overnight delivery system the seemed ridiculous to most people; today even the post office offers overnight delivery. A decade ago, Toyota could develop a new car twice as fast as GM; today all automotive companies measure and brag about the speed with which they can bring a new car to market.

Let’s revisit those customers you wish would make up their minds and stick to their decisions. Ask yourself this question: Once they do make up their minds, how fast can you reliably and repeatedly deliver what they want? Perhaps the problem does not lie in customers who can’t make up their minds and keep changing their decisions. Perhaps the problem lies in asking them to decide well before they have the necessary information to make a decision, and in taking so long to deliver that their circumstances change.

Principles of Lean Software Development
There are seven principles of Lean Software Development, drawn from the seven principles of Lean Thinking. These principles are not cook-book recipes for software development, but guideposts for devising appropriate practices for your environment.[2] These lean principles have led to dramatic improvements in areas as diverse as military logistics, health care delivery, building construction, and product development. When wisely translated to your environment, they can change your basis of competition.

Eliminate Waste
All lean thinking starts with a re-examination of what waste is and an aggressive campaign to eliminate it. Quite simply, anything you do that does not add value from the customer perspective is waste. The seven wastes of software development are: 
  • Partially Done Work (the “inventory” of a development process)
  • Extra Processes (easy to find in documentation-centric development)
  • Extra Features (develop only what customers want right now)
  • Task Switching (everyone should do one thing at a time)
  • Waiting (for instructions, for information)
  • Handoffs (tons of tacit knowledge gets lost)
  • Defects (at least defects that are not quickly caught by a test)
All lean approaches focus on eliminating waste by looking at the flow of value from request to delivery. So if a customer wants something, what steps does that customer request have to go thorough to get delivered to the customer? How fast does that process flow? If a customer request waits in a queue for approval, a queue for design, a queue for development, a queue for testing, and a queue for deployment, work does not flow very fast. The idea is to create cells (or teams) of people chartered to take each request from cradle to grave, rapidly and without interruption. Then value flows.

Amplify Learning
The game of development is a learning game: hypothesize what might work, experiment to see if it works, learn from the results, do it again. People who design experiments know that greatest learning occurs when half of the experiments fail, because this exposes the boundary conditions. A development environment is not a place for slogans such as:
  • Plan The Work And Work The Plan
  • Do It Right The First Time
  • Eliminate Variability
The learning that comes from short feedback loops is critical to any process with inherent variation. The idea is not to eliminate variation, it is to adapt to variation through feedback. Your car’s cruise control adapts to hilly terrain by frequently measuring the difference desired speed and actual speed and adjusting the accelerator. Similarly, software development uses frequent iterations to measures the difference between what the software can do and what the customer wants, and makes adjustments accordingly.

A lean development environment focuses on increasing feedback, and thus learning. The primary way to do this in software development is with short, full-cycle iterations. Short means a week to a month. Full cycle means the iteration results in working software: tested, integrated, deployable code. There should be a bias to deploy each iteration into production, but when that is not possible, end users should simulate use of the software in a production-equivalent environment.

We have known for a long time that iterative (evolutionary) development is the best approach for software development. In 1987 the report of the Defense Science Board Task Force on Military Software noted: “Document-driven, specify-then-build approach lies at the heart of so many DoD software problems…. Evolutionary development is best technically, and it saves time and money.”[3]


Delay Commitment
Delaying commitment means keeping your options open as long as possible. The fundamental lean concept is to delay irreversible decisions until they can be made based on known events, rather than forecasts. Economic markets develop options as a way to deal with uncertainty. Farmers, for example, can buy an option on the future price of grain. If the price drops, they have protected their profits. If the price raises, they can ignore the option and sell at the higher price. Options let people delay decisions until they have more information.

There are a lot of ways to keep options open in software development. Here are a few:
  • Share partially complete design information.
  • Organize for direct, worker-to-worker collaboration.
  • Develop a sense of when decisions must be made.
  • Develop a sense of how to absorb changes.
  • Avoid Repetition
  • Separate Concerns
  • Encapsulate Variation
  • Defer Implementation of Future Capabilities
  • Commit to Refactoring
  • Use Automated Test Suites
Deliver Fast
To those who equate rapid software development with hacking, there seems to be no reason to deliver results fast, and every reason to be slow and careful. Similarly, when Just-in-Time concepts surfaced in Japan in the early 1980’s, most western manufacturers could not fathom why they made sense. Everybody knew that the way to make customers happy was to have plenty of product on the shelf, and the way to maximize profits was to build massive machines and keep them busy around the clock. It took a long time for people to realize that this conventional wisdom was wrong.

The goal is to let your customer take an options-based approach to making decisions, letting them delay their decisions a long as possible so they can make decisions based on the best possible information. Once your customers decide what they want, your goal should be to create that value just as fast as possible. This means no delay in deciding what requests to approve, no delay in staffing, immediate clarification of requirements, no time-consuming handoffs, no delay in testing, no delay for integration, no delay in deployment. In a mature software development organization, all of this happens in one smooth, rapid flow in response to a customer need.

Empower the Team
In a lean organization, things moves fast, so decisions about what to do have to be made by the people doing the work. Flow in a lean organization is based on local signaling and commitment amongst team members, not on management directives. The work team designs its own processes, makes its own commitments, gathers the information needed to reach its goals, and polices itself to meet its milestones.

Wait a minute, you say. Why would I want to be empowered? If I make the decisions, then I’ll get blamed when things go wrong. A team is not empowered unless it has the training, expertise, and leadership necessary to do the job at hand. But once those elements are in place, a working team is far better equipped to make decisions than those who are not involved in the day-to-day activities of developing software. It is true that decision-making carries greater responsibility, but it also brings significantly greater influence on the course of events and the success of the development effort.

Consider an emergency response unit such as firefighters. Members receive extensive training, both in the classroom and on the job. Exercises and experience imprint patterns of how to respond to difficult situations. When an emergency occurs, the team responds to the situation as it unfolds; there is little time to ask remote commanders what to do, nor would it make sense. The important thing is that the responding teams have the training, organization and support to assess the situation as they encounter it and make basically correct decisions on their own.

Similarly in software, the development team is in the best position to know how to respond to difficult problems and urgent requests. The best way to be sure that you get things right is to work directly with customers to understand their needs, collaborate with colleagues to figure out how to meet those needs, and frequently present the results to customers to be sure you are on the right track. Management’s job to supply the organization, training, expertise, leadership, and information so that you generally make the right decisions, make rapid course corrections as you learn, and end up with a successful outcome.

Build Integrity In
There are two kinds of integrity – perceived integrity and conceptual integrity. Software with perceived integrity delights the customer – it’s exactly what they want even though they didn’t know how to ask for it. Google comes to mind – when I use Google I imagine that the designers must have gotten inside my head when they added the spelling checker. I would never have known to ask for this feature, but these days I type most URLs into the Google toolbar because if I mistype, Google will set me straight.

The way to achieve perceived integrity is to have continuous, detailed information flow from the users, or user proxies, to the developers. This is often done by an architect or master designer who understands the user domain in detail and makes sure that the developers always have the real user needs in front of them as they make day-to-day design decisions. Note that the technical leader facilitates information flow and domain understanding, she or he is intimately involved in the day-to-day work of the developers, keeping the customer needs always in mind. However, it is the developers, not the leader, who make the detailed, day-to-day decisions and tradeoffs that shape the system.

Conceptual integrity means that all of the parts of a software system work together to achieve a smooth, well functioning whole. Software with conceptual integrity presents the user with a single metaphor of how a task is to be done. You don’t have one way of buying airline tickets if you are paying with cash and a totally different way if you are using frequent flier miles. You don’t use kilometers in one module and miles in another.

Conceptual integrity is achieved through continuous, detailed information flow between various technical people working on a system. There are no two ways about it, people have to talk to each other, early and often. There can be no throwing things over the wall, no lines between supplier, development team, support team, customer. Everyone should be involved in detailed discussions of the design as it develops, from the earliest days of the program.

For example, Boeing credits its rapid and successful development of the 777 to its ‘Working Together’ program, where customers, designers, suppliers, manufacturers, and support teams all met from the start to design the plane. Early on it was discovered that the fuel tank was beyond the reach of all existing refueling trucks, a mistake that was easily fixed. In a normal development process this expensive mistake would not have been discovered until someone tried to fuel the first plane.

There are those who believe that software integrity comes from a documentation-centric approach to development: define the requirements in detail and trace every bit of code back to those requirements. In fact, such an approach tends to interfere with the technical communication that is essential to integrity. Instead of a documentation-centric approach, use a test-centric approach to integrity. Test early, test often, test exhaustively, and make sure an automated test suite is delivered as part of the product.

See the Whole
When you look at them closely, most theories of how to manage software projects are based on a theory of disaggregation: break the whole into individual parts and optimize each one. Lean thinking suggests that optimizing individual parts almost always leads to sub-optimized overall system.

Optimizing the use of testing resources, for example, decreases the ability of the overall system to rapidly produce tested, working code. Measuring an individual’s ability to produce code without defects ignores the well-known fact that about 80% of defects are caused by the way the system works, and hence are management problems.

The best way to avoid sub-optimization and encourage collaboration is to make people accountable for what they can influence, not just what they can control. This means measuring performance one level higher than you would expect. Measure the team’s defect count, not that of individuals. Make testing as accountable for defect-free code as developers. To some it seems unfair to hold a team accountable for individual performance, but lean organizations have found that individuals are rarely able to change the system which influences their performance. However a team, working together and responsible for its own processes, can and will make dramatic improvements.

Conclusion
To keep customers from changing their minds, raise the maturity of your organization to the level where it can reliably deliver what customers want so fast that they have no time to change their minds. Focus on value, flow, and people, the rest will take care of itself
_________________
References
[1]Harold Thimbleby, "Delaying Commitment" IEEE Software, May 1988.

[2]The book Lean Software Development: An Agile Toolkit by Mary Poppendieck and Tom Poppendieck, Addison-Wesley Professional, 2003, provides twenty two tools for converting lean principles into agile software development practices.

[3]Craig Larman, “A History of Iterative and Incremental Development”, IEEE Computer, June 2003

Screen Beans Art, © A Bit Better Corporation