Monday, 18 March 2002

Lean Design

For over a decade, a manufacturing metaphor has been used to bring about improvements in software development practices.  But even the originators of the metaphor recognize that it’s time for a change.  From SEI’s COTS-Based Systems (CBS) Initiative we hear:[1]
“Indeed, to many people software engineering and software process are one and the same thing. An entire industry has emerged to support the adoption of CMM or ISO-9000 models, and process improvement incentives have played a dominant role in defining roles and behavior within software development organizations. The resulting roles and behaviors constitute what we refer to as the process regime.
“The process regime was born of the software crisis at a time when even large software systems were built one line of code at a time. With some logic it established roles and behaviors rooted in a manufacturing metaphor, where software processes are analogous to manufacturing processes, programmers are analogous to assembly-line workers, and the ultimate product is lines of code. When viewed in terms of software manufacturing, improvements in software engineering practice are equated with process improvement, which itself is centered on improving programmer productivity and reducing product defects. Indeed, the manufacturing metaphor is so strong that the term software factory is still used to denote the ideal software development organization.

“The process regime might have proven adequate to meet the software crisis, or at least mitigate its worst effects, but for one thing: the unexpected emergence of the microprocessor and its first (but not last!) offspring, the personal computer (PC). The PC generated overwhelming new demand for software far beyond the  capacity of the conventional software factory to produce.

“The response to the growing gap between supply and demand spawned an impressive range of research efforts to find a technological “silver bullet.” The US government funded several large-scale software research efforts totaling hundreds of millions of dollars with the objective of building software systems “better, faster and cheaper.” While the focused genius of software researchers chipped away at the productivity gap, the chaotic genius of the free market found its own way to meet this demand—through commercial software components.

“The evidence of a burgeoning market in software components is irrefutable and overwhelming. Today it is inconceivable to contemplate building enterprise systems without a substantial amount of the functionality of the system provided by commercial software components such as operating systems, databases, message brokers, Web browsers and servers, spreadsheets, decision aids, transaction monitors, report writers, and system managers.

“As many organizations are discovering, the traditional software factory is ill equipped to build systems that are dominated by commercial software components. The stock and trade of the software factory—control over production variables to achieve predictability and then gradual improvement in quality and productivity—is no longer possible. The software engineer who deals with component-based systems no longer has complete control over how a system is partitioned, the interfaces are between these partitions, or how threads of control are passed or shared among these partitions. Traditional software development processes espoused by the process regime and software factory that assume control over these variables are no longer valid. The process regime has been overthrown, but by what?

“Control has passed from the process regime to the market regime. The market regime consists of component producers and consumers, each behaving, in the aggregate, according to the laws of the marketplace.

“The organizations that have the most difficulty adapting to the component revolution are those that have failed to recognize the shift from the process to the market regime and the loss of control that is attendant in this shift. Or, having recognized the shift, they are at a loss for how to accommodate it.
So it’s official, the manufacturing metaphor for software development improvement is needs to be replaced, but with what?  Let’s look to Lean Thinking for a suggestion.

How Programmers Work
A fundamental principle of Lean Thinking is that the starting point for improvement is to understand, in detail, how people actually do their work.   If we look closely at how software developers spend their time, we see that they do these things in sequence:  {analyze–code–build–test}.   First they figure out how they are going to address a particular problem, then they write code, then they do a build and run the code to see if it indeed solves the problem, and finally, they repeat the cycle.  Many times.  This is how programmers work.

An interesting thing about software development is that this cycle:  {analyze–code–build–test}, occurs both in the large and in the small.  Every large section of software will pass through this cycle (many times), but so will every small section of code.  A developer may go through these steps several times a day, or even, many times per hour.  Generally there is no particular effort, nor any good reason, to get the code exactly right the first time.  Try it, test it, fix it is a far more efficient approach to programming than perfection in the first draft.  Just as writers go through several drafts to create a finished piece of work, so do software developers.

The Wrong Metaphor
Because the software development cycle occurs both in the large and in the small, there have been attempts to divide the software development cycle and give each piece of the cycle to a different person.  So for instance, someone does the analysis, another person does the design, someone else writes code, a clerk does an occasional build, and QC people run tests.  This ‘assembly line’ approach to software development comes from the manufacturing metaphor, and basically, it just doesn’t work.

The reason a manufacturing metaphor does not work for development is because development is not sequential, it is a cycle of discovery. The {analyze–code–build–test} cycle is meant to be repeated, not to happen only once.  Further, as ideas and information move through this cycle, two things must be assured.  First,  information must not be lost through handoffs, and second, feedback from the cycle must be as short as possible.

The manufacturing metaphor violates both of these requirements.  First of all, handing off information in a written format will convey at best half of the information known to those who write the documents.  The tacit knowledge buried in the minds of the writers simply does not make it into written reports.  To make matters worse, writing down information to pass along to the next step in the cycle introduces enormous waste and dramatically delays feedback from one cycle to the next. 

This second point is critically important.  The cycle time for feedback from the test phase of the cycle should be in minutes or hours; a day or two at the outside.  Dividing the development cycle among different functions with written communication between them stretches the cycle out to the point of making feedback difficult, if not impossible.

Some may argue with the premise that software development is best done by using a discovery cycle.  They feel that developers should be able to write code and ‘Get it right the First Time”.  This might make sense in manufacturing, where people make the same thing repeatedly.  Software development, however, is a creative activity.  You would never want a developer to be writing the same code over and over again.  That’s what computers are for.

The Difference Between Designing and Making
Glenn Ballard of the Lean Construction Institute (LCI) sheds some light on this topic in a paper called “Positive vs Negative Iteration in Design”.  He draws a clear distinction between the two activities of designing and making.  He points out, “This is the ancient distinction between thinking and acting, planning and doing.  One operates in the world of thought; the other in the material world.”  Ballard summarizes the difference between designing and making in this manner:


The important thing to notice is that the goals of ‘designing’ and ‘making’ are quite different.  Designing an artifact involves understanding and interpreting the purpose of the artifact.  Making an artifact involves conforming to the requirements expressed in the design, on the assumption that the design accurately realizes the purpose.

A striking difference between designing and making is the fact that variability of outcomes is desirable during design, but not while making.  In fact, design is a process of finding and evaluating multiple solutions to a problem, and if there were no variability, the design process would not be adding much value.  As a corollary, Ballard suggests that iteration creates value in design, while it creates waste (rework) in making.  To put it another way, the slogan “Do it Right the First Time” applies to making something after the design is complete, but it should not be applied to the design process.

In the {analyze–code–build–test} cycle, notice that both analyzing and coding are design work.  There are many ways to create a line of code; individual developers are making decisions every minute they are writing code.  There is no recipe to tell them exactly how to do things.  They are writing the recipe for the computer to follow.  It is not until we get to the ‘build’ stage of the cycle that we find ‘making’ activity.  And indeed, all of the rules of ‘making’ apply to a software build:  No one should break the build, and every build with the same inputs, had better get the same outputs.

Cycles
This brings us to the last step of the software development cycle:  test.  Is testing ‘designing’ or ‘making’ or yet a third element?  In fact, designing tests is a creative activity, often part of the design.  Further, the results of tests are continually fed back into the design to improve it.  So in a very real sense, the test step is ‘designing’, not ‘making’.  Further, the ‘test’ step is what causes the cycle to loop back and repeat, it is what makes development work into a cycle in the first place.  In making, it is not desirable to test and rework; however, in development, repeating the cycle is the essence of doing work.  Development is basically an experimental activity.

There are other well-known cycles that bear mentioning here, and all of them end with a step which causes the cycle to repeat.  Some examples are:
  1. The Scientific Method:  {Observe – Create a Theory – Predict from the Theory – Test the Predictions}  Graduate students know this well.

  2. The Development Approach:  {Discover – Assemble – Assess} This bears a striking (and not accidental) resemblance to the software development cycle.

  3. The Demming Cycle:  {Plan – Do – Check} – Act.  This is a three-step cycle {Plan – Do – Check}, followed by – Act once the cycle yields results.   A more complete definition of the Demming Cycle is: {Identify Root Causes of Problems – Develop and Try a Solution – Measure the Results}  Repeat Until a Solution is Proven, then – Standardize the Solution.  Demming taught that all manufacturing processes should be continually improved using this cycle.

In Search of Another Metaphor
If software developers spend their days in a continual {cycle of design–code–build–test}, we might gain insight if we find other workers who use a similar cycle.  In this quest we might eliminate workers in manufacturing, who are not involved in designing the product they produce.  On the other hand, in Lean Manufacturing, workers are continually involved in redesigning their work processes.  Despite this, it seems that software developers more closely resemble product designers than product makers, because a large portion of software development time involves designing the final product, both in the large and in the small.  But unlike product developers, software developers not only design, but also produce and test their product.

We might compare software developers to the skilled workers in construction, who often do a lot of on-site design before they actually produce work.  An electrician, for instance, must understand the use of the room to locate outlets, and must take framing, HVAC and plumbing into account when routing wires.   Software developers might also be thought of as artists and craftsmen, who routinely extend the design process right into the making process.

Learning Lessons from Metaphors
New Product Development, Skilled Construction Workers, Artists and Craftsmen – as we attempt to learn from these metaphors we must also take care not to go too far, as happened with the manufacturing metaphor.  The careful use of a metaphor involves abstracting to a common base between disciplines, and then applying the abstraction to the new discipline (software development) in a manner appropriate to the way work actually occurs in that discipline.   

Three useful abstractions come immediately to mind as we apply design and development metaphors to software development:

Abstraction 1:  Emphasize ‘Designing’ Values, not ‘Making’ Values
Code should not be expected to “Conform to Requirements” or be “Right the First Time”.  These are ‘making’ values.  Instead, software should be expected to be “Fit for Use” and “Realize the Purpose” of those who will be using it.   Disparaging software changes as ‘rework’ exemplifies the misuse of a ‘making’ value.  Since software development is mostly about designing, not making, the correct value for software development is precisely the opposite.  Iterations are good, not bad.  They lead to a better design.

Ballard states that:  “Designing can be likened to a good conversation, from which everyone leaves with a better understanding than anyone brought with them…  Design development makes successively better approaches on the whole design, likegrinding a gem, until it gets to the desired point….”

Abstraction 2:  Compress the {Design–Code–Build–Test} Cycle Time
Once we recognize that the {design–code–build–test cycle} is the fundamental element of work in software development, then principles of lean thinking suggest that compressing this cycle will generate the best results.  Compressing cycle time makes feedback immediate, and thus allows for a system to rapidly respond to both defects and change.

Based on this hypothesis, we may predict that the effectiveness of Extreme Programming comes from its dramatic compression of the {design–code–build–test cycle}.  Pair programming works to shorten design time because design reviews occur continuously, just as design occurs continuously.  Writing test code before production code radically reduces the time from coding to testing, since tests are run immediately after code is written.   The short feedback loop of the {design–code–build–test cycle} in all agile practices is a key reason why they produce working code very quickly.

Abstraction 3:  Use Lean Design Practices to Reduce Waste
Not all design iteration is good; iterations must add value and lead to convergence.  Many times a design will pass from one function to another, each adding comments and changes, causing more comments and changes, causing another round of comments and changes, in a never-ending cycle.  This kind of iteration does not produce value, and is thus ‘negative iteration’ or ‘waste’.

Ballard suggests the following ‘Lean Design’ techniques to reduce negative iteration, or in other words, obtain design convergence:
  1. Design Structure Matrix.   Steven Eppinger’s article “Innovation at the Speed of Information” in the January 2001 issue of Harvard Business Review suggests that design management should focus on information flows, not task completions, to achieve the most effective results. The Design Structure Matrix is a tool that answers the question: “What information do I need from other tasks before I can complete this one?”

  2. Cross Functional Teams.  Cross-functional teams which collaborate and solve problems are today’s standard approach for rapid and robust design with all interested parties contributing to decisions.  One thing to remember is to ‘let the team manage the team’.

  3. Concurrent Design / Shared Incomplete Information.    Sequential processing results in part from the assumption that only complete information should be shared.  Sharing incomplete information allows concurrent design to take place.  This both shortens the feedback loop and allows others to start earlier on their tasks.

  4. Reduced Batch Sizes.   Releasing small batches of work allows downstream work to begin earlier batches and provides for more level staffing.  It also is the best mechanism for finding and fixing problems early, while they are small, rather than after they have multiplied across a large batch.

  5. Pull Scheduling.  Ballard notes:  “The Lean Construction Institute recommends producing such a work sequence by having the team responsible for the work being planned to work backwards from a desired goal; i.e., by creating a 'pull schedule'. Doing so avoids incorporation of customary but unnecessary work, and yields tasks defined in terms of what releases work and thus contributes to project completion.”

  6. Design Redundancy. When it is necessary to make a design decision in order to proceed, but the task sequencing cannot be structured to avoid future changes, then the best strategy may be to choose a design to handle a range of options, rather than wait for precise quantification.  For example, when I was a young process control engineer, I used to specify all process control computers with maximum memory and disk space, on the theory that you could never have enough.  In construction, when structural loads are not known precisely, the most flexible approach is often to design for maximum load.

  7. Deferred Commitment / Least Commitment.  Ballard writes:  “Deferred commitment is a strategy for avoiding premature decisions and for generating greater value in design. It can reduce negative iteration by simply not initiating the iterative loop. A related but more extreme strategy is that of least commitment; i.e., to systematically defer decisions until the last responsible moment; i.e., until the point at which failing to make the decision eliminates an alternative. Knowledge of the lead times required for realizing design alternatives is necessary in order to determine last responsible moment.

  8. Shared Range of Acceptable Solutions  / Set-Based Design.   The most rapid approach to arriving at a solution to a design problem is for all parties to share the range of acceptable solutions and look for an overlap.  This is also called set-based design, and is widely credited for speeding up development at Toyota, decreasing the need for communication, and increasing the quality of the final products.

These eight Lean Construction techniques, particularly set-based design, is being tested in construction and expected to result in dramatic improvements in design time (~50%) and construction time (~30%).  In addition, work can be leveled throughout the project, better, more objective decisions are expected.

The following two additional Lean Design techniques are particularly applicable to software development:
  1. Frequent Synchronization.  It is widely recognized in software development that daily (or more frequent) builds with automated testing is the best way to build a robust system rapidly.

  2. The Simplest ‘Spanning Application’ Possible.  This is a software development technique  particularly good for testing component ensembles and legacy system upgrades. The idea is not to implement module-by-module, but implement a single thread across the entire system, so as to test the interactions of all parts of a system along a narrow path.

____________________

[1] From draft version of Chapter 1 of Building Systems from Commercial Components,  [Addison-Wesley, 2001] by Kurt Wallnau, Scott Hissam, and Robert Seacord; downloaded from SEI COTS-Based Initiative website.


Screen Beans Art, © A Bit Better Corporation

Sunday, 17 March 2002

Is Agile Software Development Sustainable?

Agile software development practices are often criticized as being suitable only for small, co-located teams of experts working on modest sized projects. If agile development is truly limited to these perceived boundaries, then it is probably not sustainable. Software development practices must address large projects, multiple geographies, and a general population of developers if they are to become the basis of a thriving new paradigm.

On the other hand, in The Innovator’s Dilemma, [HarperBusiness, 2000], Clayton Christensen notes that all disruptive technologies start by addressing a market which is considered small and “down-market” from existing technologies. So if agile practices are a “disruptive technology” compared to traditional software development processes, then it would be quite in character for them to start by addressing small systems. The questions is, can agile processes grow to address the needs of large systems?

The answer lies in recognizing that the needs of large systems are changing in a way that is best addressed by agile practices. Over the last decade, corporations have tended to use commercially available systems to address more and more information needs. Initially, these systems tended to be monolithic and proprietary, but this is changing. Corporations have found that any monolithic system, even one which is commercially supplied, rapidly becomes a legacy system as new technologies combine with mergers to obsolete any system that cannot adapt to change.

The result has been a tendency for developers of large systems to prefer the use of commercially supplied components, from API’s to Web Services, for a sizeable portion of any application. In Building Systems from Commercial Components, [Addison-Wesley, 2001] Kurt Wallnau and coauthors point out that large systems cannot be built from software components using traditional development processes. The marketplace in which component vendors compete dictates that components are complex, they change frequently, and customers pretty much have to take whatever is offered.

System development in the component marketplace is distinctly different from traditional software development. To begin with, one does not start by capturing user requirements, but by understanding the capabilities of available components. The challenge is to bring the user requirements into line with available software, rather than the other way around. System architecture is generally dictated by the available components and the key architectural task is to create an ‘ensemble’ of components that work well together. Finally, designing a system to be able to deal with unpredictable change is a fundamental skill when working with commercial components. If nothing else is certain, the fact that these components will constantly change can be guaranteed.

The bottom line is that the problems that used to be addressed by traditional software processes have changed, and those processes are no longer up to the task of addressing large project development. Meanwhile, the agile practices being honed in small projects are just the ones needed in the a large project environment which deals with legacy systems and commercial components. So don’t be surprised to see agile practices move up-market, as disruptive technologies always do, and take over the large projects as well.

A quote from a version of Chapter 1 of Building Systems from Commercial Components, [Addison-Wesley, 2001] by Kurt Wallnau, Scott Hissam, and Robert Seacord.
Whatever position one takes regarding the CMM versus ISO-9000 one thing is clear: these software management standards have, for over a decade, established the context for improving the practice of software development. Indeed, to many people software engineering and software process are one and the same thing. An entire industry has emerged to support the adoption of CMM or ISO-9000 models, and process improvement incentives have played a dominant role in defining roles and behavior within software development organizations. The resulting roles and behaviors constitute what we refer to as the process regime.

The process regime… established roles and behaviors rooted in a manufacturing metaphor, where software processes are analogous to manufacturing processes, programmers are analogous to assembly-line workers, and the ultimate product is lines of code. When viewed in terms of software manufacturing, improvements in software engineering practice are equated with process improvement, which itself is centered on improving programmer productivity and reducing product defects. Indeed, the manufacturing metaphor is so strong that the term software factory is still used to denote the ideal software development organization….

Today it is inconceivable to contemplate building enterprise systems without a substantial amount of the functionality of the system provided by commercial software components such as operating systems, databases, message brokers, Web browsers and servers, spreadsheets, decision aids, transaction monitors, report writers, and system managers.

As many organizations are discovering, the traditional software factory is ill equipped to build systems that are dominated by commercial software components. The stock and trade of the software factory—control over production variables to achieve predictability and then gradual improvement in quality and productivity—is no longer possible. The software engineer who deals with component-based systems no longer has complete control over how a system is partitioned, the interfaces are between these partitions, or how threads of control are passed or shared among these partitions. Traditional software development processes espoused by the process regime and software factory that assume control over these variables are no longer valid. The process regime has been overthrown….

Screen Beans Art, © A Bit Better Corporation

Tuesday, 5 March 2002

Lean Construction

“What are you doing here?”  they asked.

They were construction foremen, superintendents and project managers attending a course in construction planning from the Lean Construction Institute (LCI).  Indeed, what was I doing there?

I started to explain:  “In software development, we are told we should manage our projects like construction projects, where a building is designed at the start, cost and schedule are predictable, and customers get what they expect.”

Silence.  “You’re kidding, right?”  “No, honest, that’s what we’re told.”

Incredulity turns to laughter.  The idea that programmers would want to manage projects like the construction industry strikes my classmates as ludicrous.

They struggle every day with a master schedule which bears little relationship to reality, with materials that should be on site but are not, or materials that need to be stored because they arrived before they were needed.  The never know when the crew that precedes them will be ready to turn an area over to them, so they never know how to staff their crews.  They are plagued constantly by the two biggest forms of construction waste – people waiting for materials and work waiting for people.

Construction might be thought of as a long series of handoffs between trades.  When building a house, there maybe 165 handoffs.  Every handoff introduces an element of variability.  Add to this the variability introduced by weather, staging material, finding tools, sharing equipment, and wide variation from the master schedule is a simple matter of statistics.

In manufacturing, MRP systems are known to produce wide swings in plans when adjusting for small variations in production, which makes them relatively useless for detailed shop floor planning.   For the same reason, the construction industry has found a master schedule to be a relatively useless technique for detailed construction planning.  These are open loop control systems which are being incorrectly applied to planning a variable system, which needs to be controlled by a closed loop system.

The Lean Construction Institute teaches construction superintendents, foremen, and project managers to plan work in three windows:  a phase window of three months or so, a six week look-ahead window which rolls weekly, and a detailed plan for the next week.

The phase plan is the point at which major plans for how work is done will be devised.  The level of pre-fabrication of building elements, the sequence of construction events, and the need for long lead time items are addressed.  The phase is planned backward in a ‘pull’ method; that is, the plan starts from the completed set of work and moves backward to lay out what needs to be done to get there.

Each week a new week rolls off the phase plan and onto the six week (or thereabouts)  look-ahead plan.  Each week the construction superintendents and foremen (called ‘Last Planners’ by LCI) review the look-ahead plan to assure that as work becomes due, the necessary materials are at hand and all pre-work is completed.  Every effort is made to assure that most material ordering and preparation work can be done within the look-ahead window, so keeping an eye on the next six weeks gives adequate time to be sure everything is in place when it comes time to do the work.

Each week the ‘Last Planner’ team commits to the plan for the following week.   The most important thing that they learn in the LCI class is to commit only to what should be done and can be done.  Once the commitment is made, each crew is expected to meet its commitment, and success is the measured in terms of meeting the weekly promises.

The ‘Last Planner’ system taught by LCI greatly reduces variability in construction planning, because it is a closed loop control system.  Work is not planned by the master schedule, but by real people (‘Last Planners’) who make detailed short term plans based on what material is actually available, what the near term weather forecasts say, whether the previous crew can be trusted to be done, what crew members are available for the job, etc.  The reliability of these plans has resulted in enormous productivity gains and a significant reduction in construction site problems.

What Does This Have To Do With Software?
Software developers don’t think of their work as a series of handoffs between trades, because often projects are broken into small segments and a single team is assigned to develop each segment.  In this environment, daily builds and automated tests are often used to integrate new code, assuring that teams do not interfere with each other’s work.

However, there are a lot of handoffs in software development.  Trace the path of requirements as they move from customer to developer, and count the handoffs.

As I sat in the construction class, I was surprised at how much design work goes on during construction.  You might think that once construction drawings and specs are approved, the design would be complete.  You would be wrong.  Here are some typical examples of things that happen every day in construction:

Example One:  “What’s that cloud in the basement drawing?  Oh!  It’s an elevator shaft that hasn’t been specified.  But we are about to pour concrete!  Call the architect!”

Example Two:  “How is this conference room going to be furnished?  The electrician has to decide how to lay out the lighting and where to put the outlets.  Someone needs to let us know where the phone and Ethernet terminations go.  Call the customer.”


Example Three:  “The hospital has hired a new head surgeon and he wants the surgical area to be laid out differently.  He says technology has changed in the two years since the drawings were approved and the layout in the drawings is completely out of date.”

In my construction class, the idea of “freeze the design” meets the same fate as “follow the master schedule.”  Laughter.  Not only is freezing the design impossible, but given the long building times in construction, attempting to do so is sure to make the real customer – the people who move into the building – unhappy with the result.

Instead, design is just another element of the ‘Last Planner’ system.  During the look-ahead period, incomplete designs are identified and arrangements are made to fill in the blanks.  In the same way that lack of materials is the biggest cause of construction delay, lack of requirements is the biggest cause of design delay.  The ‘Last Planner’ system pulls in requirements just as it pulls in materials, and LCI recognizes that designs done as late as possible are often the best.  In fact, they recommend that design decisions be made at the ‘Last Responsible Moment’ even as materials arrive ‘Just in Time’. 

The ‘Last Planner’ system creates commitments between workers on what will happen next week, while looking out six weeks to assure that everything will be in place for work that should happen in the near future.  Most planning systems are directive, but this planning system is collaborative.  In a weekly meeting that lasts less than an hour, the ‘Last Planners’ – foremen, crew chief, superintendents, designers – commit to each other and then make good on those commitments.  The system adapts each week for variations such as delayed material or bad weather or changing customer requirements.

The Problem With Task-based Planning
At a construction site, various trades typically work separately on tasks specified in and coordinated by the master schedule.  But this doesn’t give them any incentive to work together, nor does it provide for much planning on the best way to deliver a feature.  At the LCI class I learned that significant gains can be achieved by looking at a construction project as delivering a set of features, rather than accomplishing a set of isolated tasks.

Case One:  The hallway wall of a prison cell is typically pre-fabricated and set in place, then cement is poured, and much later doors are added.  The problem is, if the cement is just a bit too high, the doors don't close.  In one prison, fully a third of the doors had to be ground to fit. On a recent prison project, the management firm (one of LCI’s best customers) suggested that the wall pre-fabricator add the door to the pre-fabrication process.  This was unheard-of, because it involved the coordination of two trades that did work in very different phases of the project.  Upon investigation, the idea was found to be not only possible, but in the end it saved a large chunk of money.  Better still, the new approach is saving more money on each new project.

Case Two:  In building a parking structure, materials for beams were lifted by the crane onto each floor and assembled in place.  Then the crew assembling the beams was released while the next floor was prepared for beams.  The boom and bust cycle of employment created a problem in retaining good crews to work on the beams.  LCI suggested that the beams be assembled on the ground and lifted into place by the cranes, creating steady work for a smaller crew which would assemble the beams as well as for the crew adding the next floor.  It was tricky to work out the crane’s schedule, because typically it is released to only one crew at a time and the fact that it was used only one third of the time was not immediately apparent.  However, the change was made and site productivity increased dramatically thereafter.

Case Three:  One of LCI’s best customers has moved to feature-based planning from the beginning of a project.  It recently divided a new field house at a university into about a dozen main ‘features’:  practice fields, swimming pool, basketball courts, etc.  Each feature was given an appropriate portion of the budget, and a cross-functional team (including users) is assigned to each feature.  The teams in turn broke their features down into sub-features and decided how to spend their allotted money.  Sometimes they negotiated with other feature teams for more of the budget.  As the building went up, the feature teams made decisions which kept their portion under budget.  The result was a smooth construction cycle with a minimum of changes, and a very satisfied customer.

The lesson for software development is that planning in terms of features rather than tasks can yield tremendous advantages.  The Work Breakdown Structure (WBS) method of project planning, with its emphasis on managing individual tasks, leads to sub-optimized thinking which does not correct itself, even when a more effective approach is begging to be discovered.

The Contract Environment
Greg Howell of the Lean Construction Institute told me that construction companies used to be vertically integrated.  But as time went on, tasks became segregated and associated costs identified, leading construction companies to sub-contract the cost and risk of various activities.  In a sub-contracting environment, Greg pointed out, responsibility is shifted to the sub-contractor.  The project manager assigns work, but is not responsible for it. Integrating across the trades is not really anyone’s job.

Typically there is a design firm and a construction firm under contract for any job; however, this has led to countless disagreements, finger-pointing, and even lawsuits.  Recently a practice called design-build has become popular, where the design firm is also responsible for construction.  This has created an environment where more responsibility lies with a single firm, which often leads to greater speed and productivity.  However, not all design-build arrangements guarantee that work will be coordinated across sub-contractors.  The key, Greg says, is to view construction as an integrated flow, rather than a collection of independent tasks. Companies with this mindset are the ones who come up with the ‘innovative’ ideas in the case studies above.

Lessons For Software Development
If construction projects have predictable costs, schedules and results, there is probably a sizable contingency fund for covering surprises. There is a lot of wasted time and productivity in a typical construction project. This is caused by two things:
  1. An open-loop plan which does not address variation and thus magnifies it.
  2. Fragmentation of responsibility, giving each trade incentives to optimize their individual performance.
Software developers can avoid the open loop planning problem through short cycle, closed loop planning. Various agile practices recommend adopting an iteration cycle of two to six weeks, augmented with daily planning meetings. The important capability is to deliver code which is fully tested and ready for release on a regular, short cycle. This is the essence of closed loop control in software development.

Sub-optimization is caused by rewarding people based on measurements of performance in a narrow area, rather than rewarding people for achieving broader objectives. The fact is, emphasizing cost and schedule control during software development is a contractor mentality, which tends to de-emphasize the importance of achieving overall business objectives. In practice, contracts which are meant to reduce risk often end up reducing responsibility for achieving the business goals instead.

In summary, every metaphor has its limitations, and the construction metaphor is no exception. Metaphors usually suffer when people have an incomplete understanding of the field upon which the metaphor is based. Digging deeper into construction, for example, we find that master schedules are useless for planning work, contracting practices create islands of optimization, and there are large opportunities for productivity improvement. The feature-based planning and short, closed loop cycles of agile software development are similar to the Lean Construction Institute's practices, which have been the source of significant improvements in the construction industry.

Screen Beans Art, © A Bit Better Corporation

Thursday, 21 February 2002

Lean Product Development

Agile Approaches have been the target of some serious criticisms: they don’t provide adequately for an overall design, they don’t scale, and they only work with skilled developers. If these criticisms are true, then agile methodologies might go the way of the dot-com’s. In order for agile methods to be sustainable, they must be able to deal with design, they have to scale, and ordinary people have to be able to implement them.

It might be instructive to find companies which have sustainable agile development approaches, and see how they do it. If we look to new product development, instead of software development, we can find companies which have world class product development records going back 50 to 100 years. 3M and Toyota would be a couple of good examples. How have they sustained agile development practices?

“3M’s core competency, in fact, its core business, is the building of businesses.” According to CEO, Jim McNerney. At 3M, every business manager knows that 30% of their products have be less than 4 years old.

“The real difference between Toyota and other vehicle manufacturers is not the Toyota Production System, it is the Toyota Product Development System.”, claims Kosaku Yamada, Chief Engineer of Toyota’s Lexus line. Toyota churns out many superb cars with amazingly short development times.

3M uses small development teams (a dozen people over a year), while Toyota teams are large (500 people, 3 years). Both companies have very agile processes, which they have sustained for decades.

Organization
1. Management
Both 3M and Toyota use balanced matrix management approaches. Every new product program has a strong leader, at 3M it is the ‘champion’ and at Toyota it is the shusa or chief engineer. In both cases, these people ‘own’ the product – their name is associated with it. We have Art Fry’s Post-it notes and Kosaku Yamada’s Lexus. These leaders are the ‘voice of the customer’ to the team and they assure the proper amount of design goes into it before detailed development proceeds. They have the best job in the company and ‘developers’ are dying to be allowed to work on their teams.

At both Toyota and 3M, the ‘developers’ stay in their functional departments while on the team. This is because the functional department provides the apprentice, journeyman, master – type training that developers need to master their craft. Functional managers get involved at a detailed level with newbies, less with more senior people. They provide training and guidance, assistance with standards and proper ways to investigate new ideas and publish results.

2. Process
The concept of a project manager is foreign to both companies, as is the idea of monitoring tasks. Both companies work on a ‘gate’ system, where the gate is a prototype tested against customers. Developers, assisted by guidance and support from their functions, are expected to meet gate milestones and meet quality standards set by the leader, but it is not the leader’s responsibility to be sure they do, it is the function’s responsibility.

Although product development practices are quite consistent across each company, neither would measure very high on the CMM scale. Both companies engage in highly disciplined learning activities, but neither considers documenting procedures to be the appropriate value. Instead, each company in its own way uses the Scientific Method to explore hypothesis, publish results and design new products.

3. Learning
3M developers are scientists, inventing and patenting new materials and processes. Of course they keep very careful records and read all related literature. The have to, it’s all part of the patent process. Toyota developers are engineers, establishing tradeoff’s in charts and graphs. If a styling engineer wants to know the effect of a certain curve in a radiator on its cooling capacity, there will be a graph which shows the answer over a range of allowable curves.

The operable word here is publish, not document. 3M’s scientists and Toyota’s engineers are making the results of research available to their peers in the time-honored way of all researchers. They do not create a knowledge database, they write up results and submit them to peers who are keenly interested in their research, give talks, publish papers. The 3M scientists, mostly PhD’s, learned how to do this in graduate school.

Development Approaches
1. Spanning
Cars design involves a series of complex tradeoffs. The process of development involves setting up methods of communication so these tradeoffs can be made as effectively as possible, while focusing all the time on the ultimate vision - producing a car with integrity, that will feel like the best possible choice for its target market. Toyota is particularly good at this, and they do it by starting with a rough design of the whole car and refining it systematically, making tradeoffs at increasingly finer levels of detail.

The equivalent approach in software development is to choose the simplest spanning application possible, and implement it first. This technique is particularly good for testing component ensembles and legacy system upgrades. For example, when replacing a legacy insurance system, one would start with a simple type of policy and implement it from front to back – new policies, renewal, claims handling, and termination. The idea is not to implement module-by-module, but implement a single thread across the entire system, so as to test the interactions of all parts of a system along a narrow path.

2. Synchronization
Toyota has many independent teams working on a product, and even with the small teams at 3M, co-location of a product team is rare. It is deemed more important that a scientist be near the sophisticated equipment and knowledgeable colleagues associated with their specialty. But communication is smooth and effortless, because team members are making something together. The concrete thing they are building – a clay model of a car or a mock-up of a new traffic sign – keeps the team in touch.

All development is a series of design-build-test cycles, and the more frequently these occur, the better. Synchronization through short design-build-test cycles improves cross-functional communication and speeds up development. This concept is directly applicable to software development, where it is widely recognized that daily (or more frequent) builds with automated testing is the best way to build a robust system rapidly.

3. Convergence
Most people are annoyed when someone announces a meeting without checking to see if everyone is free. Such meetings must often be rescheduled (many times!) or missed by key people. We know it is easier to set up meetings by getting everyone to list their free time and look for an overlap.

Toyota and 3M use the same concept for product design. They explore the entire solution space and find intersections that everyone finds acceptable, gradually adding detail and converging on a solution. This approach is called set-based design, and contrasts sharply with point-based designs which start with a single solution that undergoes a series of optimizations. In most cases, set-based design produces the best design in the shortest amount of time with the least amount of communication. It’s strange that this principle, so obvious when you are scheduling meetings, seems counterintuitive in the development environment.

Lessons for Software Development
  • A ‘Champion’ provides the integrating force to be sure that the necessary level of overall design is established and the customer voice is unified, clear and available to the team.

  • Functional managers provide training and guidance for team members and establish a place for them to interact with others in their specialties.

  • Teams are small and operate independently. They are responsible for designing their own processes and tracking their work so as to meet deadlines.

  • Learning both by individuals and across functions is standard operating procedure. Development is a process of observing, predicting, testing and publishing results.

  • The entire problem is divided into segments to be addressed concurrently by small teams. The design process converges on a solution, rather than selecting one at the onset.

  • Coordination across teams and functions is established through daily builds and frequent iterations.

  • Development starts with the simplest possible spanning application. This helps to establish feasibility and architecture; it also lays the groundwork for multiple teams to work concurrently.

Screen Beans Art, © A Bit Better Corporation

Monday, 4 February 2002

Zero Defects Mentality

A ‘zero defects mentality’ is a bad thing in the military. “Demanding such a rigid standard produces timid leaders afraid to make tough decisions in crisis, unwilling to take the risks necessary for success in military operations,” Perry said. “This zero defects mindset creates conditions that will lead inevitably to failure ….”[1]

A Military Tradition
William G. Pagonis, director of Logistics during the Gulf War of 1991, wrote about the time he led his small company into crossfire to rescue stranded soldiers, against the orders of his commander: “…following a time-honored tradition in the military, I developed ‘radio trouble’ – that is, I turned the communications gear off…” and led a volunteer team to the rescue.[2]

William McKnight, who created the 3M culture of innovation, once said “Those to whom we delegate authority and responsibility, if they are good people, are going to want to do their jobs in their own way. Mistakes will be made. But if a person is essentially right, the mistakes he or she makes are not as serious in the long run as the mistakes management will make if it undertakes to tell people exactly how they must do their jobs.” [3]

Good organizations understand that in a dynamic environment, the safest course is to develop intelligent, courageous people who understand that they are expected to exercise their own initiative. Most organizations would like to think that they empower people, but their behavior would suggest otherwise.

What Would You Do?
Ponder this: What is your organization’s instinctive reaction when things go wrong?
  1. Reorganize.
  2. Develop a better plan.
  3. Send in a swat team to improve the processes.
  4. Work with the front line people to find out what they think is wrong and how it can be fixed.
Collin Powell has said: “Organization doesn’t really accomplish anything. Plans don’t accomplish anything, either. Theories of management don’t much matter. Endeavors succeed or fail because of the people involved.”[4] So you can imagine what his choice would be.

The Paradox: Superior Performance Comes From Low Control
Organizations which tolerate mistakes and overlook disobedience build an organizational culture in which everyone knows that the best way to tackle the really tough problems is through the people who are closest to them. They also build a cadre of front line workers who are not afraid to think and act on their own. Such organizations are the envy of their industries, even as their competitors try to reorganize, plan and improve processes in an attempt to compete.
__________________
Footnotes:

[1] Defense Secretary William J. Perry, Quoted by Linda D. Kozaryn, American Forces Press Service, August 6, 1996.

[2] ‘Leadership in a Combat Zone’ by William G. Pagonis, Harvard Business Review, Volume 79 number 11, December 2001.

[3] William McKnight, President and CEO of 3M from 1929–1966, quoted in Brand of the Tartan by Virginia Huck, Minnesota Mining and Manufacturing, 1955.

[4] ‘Great Military Leaders’ http://www.geocities.com/Pentagon/Bunker/6513/

The Leadership Paradox

“No one has yet figured out how to manage people effectively into battle; they must be led,” wrote John Kotter in ‘What Leaders Really Do’[1]. He notes that leadership is about helping people cope with change, while management is about coping with complexity. Leaders set direction, managers plan and budget. Leaders align people, managers organize and staff. Leaders motivate, managers control.

Champion
In this context, it should not be a surprise that each new product development program at 3M is led by a ‘champion’. Innovation at 3M is brought about by excited, motivated teams. They are led by a product champion who probably wrote the initial product concept, gathered management support for the program, and recruited most of the team. The champion interprets the product vision for the team, thus representing the customer who is not, after all, on site. The champion sets the pace of development and determines how decisions get made. A champion is also expected to keep working on a good idea even if the program gets killed by management.

Shusa
Similarly at Toyota, a new vehicle development program is led by a shusa or chief engineer. In contrast to the coordinating role of a new vehicle manager at US auto companies, the shusa has complete responsibility for the vehicle, and has the authority necessary to make all program decisions. The shusa has been called a ‘heavyweight program manager’[2], but this is a misnomer, because a shusa is a leader, much more than a manager.

Perhaps the correct characterization of a champion or shusa is a ‘respected leader’. The emphasis of the role is on setting direction, aligning the organization and motivating the team. At 3M, the champion is largely self-nominating, and in both companies, the role holds great stature. In both 3M and Toyota, the product produced by one of these leaders often bears their name (Fuji-san’s car or Art Fry’s Post-it® notes). These companies seem to understand that if a team is to deal with change and innovation, a ‘respected leader’ is needed; a coach is not enough and a manager (in the traditional sense) is the wrong approach.

Software Development
It has been claimed[3] that software development is similar to new product development, because it is an activity which creates something unique for a customer, something which has not been made before. In this sense, programming is not like manufacturing, which makes the same thing many times over and strives to make each instance the same.

If software development is like new product development, then how should software projects be led? There seems to be some ambivalence surrounding the role of leadership in agile methodologies, possibly stemming from the traditional role of a project manager in software development projects. Often the project manager does not have a technical background and may not feel responsible for understanding the technical aspects of the project. Usually the project manager is trained for and measured against the controls of scope, budget and schedule. This administrative role is quite different than the leadership role exercised by a champion or shusa .

If a software project requires vision and must cope with change, this is not going to come from following the rules taught in project management certification courses. If stakeholders need to be aligned and the team needs motivation, managing scope, schedule and cost is not the place to focus attention.

Scrum Master
What are the alternatives to project managers? Beck suggests the use of a ‘coach’. Schwaber and Beedle propose role of a ‘Scurm Master’: ‘The Scrum Master represents management and the team to each other.’[4] ‘… is in touch with all aspects of the project…’[5] ‘… is responsible for ensuring that impediments are promptly removed and decisions are promptly made.’[6]

A coach or Scrum Master is not quite the champion of 3M or the shusa of Toyota, but then again, there is a difference between new product development and most software development. At 3M and Toyota, the customer is not readily available and must be represented. In fact, it’s pretty well accepted at 3M that asking existing customers what they want is not the way to come up with innovations. Instead, you have to understand the problems that customers have, anticipate future needs, and invent something new to solve their problems. A 3M champion creates and communicates a vision of the new product, just as at Toyota, the shusa writes the description of the new vehicle. To do this, they need a high degree of technical expertise as well as a deep understanding of the customers.

Most agile methods depend upon the ‘customer’ to create a vision of the software under development. Sometimes this will work, but it places a large and sometimes unrealistic burden on the customer. While the champion and shusa are technical experts, the customer usually is not, so the customer’s vision of a solution may be limited. In practice, customers often don’t know what they want, and to make matters worse, there are often multiple stakeholders, making it unclear who the ‘customer’ really is.

The Scrum Master represents the customer to the team, and thus must understand who the customer is and what all the stakeholders really want. However, the Scrum Master is not chartered to come up with the technical vision of how to address the customers’ needs. In XP, the technical vision of the system is expected to evolve throughout multiple iterations.

Design vs. Vision
The biggest criticism of agile methodologies is that they do not provide for overall design prior to the beginning of development. At Toyota and 3M, the product largely emerges from the development process, but the programs start with an overall technical vision of what the product will look like in the end. In fact, the shusa has been equated to a system architect of a new car.[7] Both the shusa and the champion are leaders, not managers, but as very experienced technical leaders, they provide the overall design to the product under development, or assure that an overall design is established by the team. They judge the level of design necessary to allow development to proceed in an emergent manner, while assuring that there are no downstream surprises which should have been anticipated.

If a development process must deal with ‘wicked problems’ (see separate essay), then by definition, the solution emerges as development proceeds. Such projects need someone to make the tradeoffs between early design and emergent development. In world class new product development organizations, this role belongs to the champion or shusa, a ‘respected leader’ with the technical and customer savvy to make such tradeoffs.

Technical Lead
Experience shows that if there is not someone to make similar tradeoffs for a software system, large organizations have a tendency to err on the side of caution. A corporate architecture committee, customer committee or administrative coordinators will usually lack an overall vision of the project, and so will look for comfort in detail, even though the detail is not what is needed to proceed safely. It would be better if there were a technical lead on the program to create and be responsible for maintaining the technical vision. It would not be so good, however, if the technical lead were not a leader. A leader not only sets direction, but also aligns and motivates people. The shusa and champion are expected to secure resources, remove impediments, and lead the team into battle. A technical lead who either sits on a pedestal or on the sidelines will not be able to lead the team.

If becoming a technical guru or a PMI graduate does not make a person into a leader, then how should leaders be developed? First, an organization should understand what it means to develop leaders. The armed forces develops leaders as their primary responsibility. A Special Forces team, composed of a dozen experts and a leader, is expected to adapt continually to very demanding conditions, given only the broadest of objectives. But even the most ordinary army units are composed of teams with a leader who is expected to respond to events on the ground, adapt to changing conditions, make decisions and lead the team. Although military training is not being advocated, it might be educational to understand how the military trains its leaders.

Developing Leaders
At 3M, people with technical competence are encouraged to develop a new product concept based on solving a customer problem. In order to carry out that vision, they find they need to recruit and motivate a team and secure resources from the organization. This is one of the most popular career paths in the technical organization, and so many technical people learn how to follow this path.

Toyota and 3M have learned how to make the role of technical leader one of the most desirable in the corporation, and thus they are able to develop a large number of qualified leaders. On the contrary, project management is frequently considered an undesirable career path for software developers, so few seem interested in learning how to manage. To break this vicious circle, an organization needs to begin by considering how to make the role of project leadership attractive to technical experts. Changing job expectations from administration and management to vision and leadership would be a good start.

Finding Leaders
Where does an organization find people to fill the newly defined role of project leader? In many cases the training ground might already be in house. In the past ten years, supervisors and managers in operational areas such as manufacturing, logistics and customer service have been trained to focus on empowering the first line workers to deal with problems and improve their own processes. Thus many organizations already have leadership development programs in place, they just haven’t moved beyond the operational areas yet.

Good operations managers are likely to make good software project leaders, because they have already learned how to work with people and lead a team. If you are blessed with good operations, then look for respected supervisors and first line managers in operations who have a technical background or aptitude, and consider training them as project managers. Alternatively, but not as good, consider sending everyone who will lead a software team to a good training program for first line supervisors in an operational area. But note that it is easier to develop people who know how to lead into managers than it is to develop people who know how to manage into leaders.

You Get What You Expect And What You Inspect
The bottom line is that people respond to the expectations of their management. Software project leaders do not develop in a position where the primary expectation is change control and the primary measurement is earned value. An organization will get what it values, and the agile methodologies do us a great service in shifting our perception of value from process to people, from documentation to code, from contracts to collaboration, from plans to action.
______________________
Footnotes:

[1] ‘What Leaders Really Do’, John P Kotter, Harvard Business Review, Volume 79, Number 11. Reprint of article first printed in 1990.

[2] ‘Toyota’s Principles of Set-based Concurrent Engineering’, Durward K. Sobek II, Allen C. Ward and Jeffrey K. Liker, Sloan Management Review, Volume 40 #2, Winter 1999, and Product Development Performance: Strategy, Organization, and Management in the World Auto Industry, Clark, K.B. and T. Fujimoto, Harvard Business School Press, 1991.

[3] See, for example, Agile Software Development with Scrum, Schwaber, Ken and Mike Beedle, Prentice Hall, 2001, Chapter 6.

[4] Agile Software Development with Scrum, Schwaber, Ken and Mike Beedle, Prentice Hall, 2001, p 31

[5] Agile Software Development with Scrum, Schwaber, Ken and Mike Beedle, Prentice Hall, 2001, p 142

[6] Agile Software Development with Scrum, Schwaber, Ken and Mike Beedle, Prentice Hall, 2001, p 32

[7] ‘Toyota’s Principles of Set-based Concurrent Engineering’, Durward K. Sobek II, Allen C. Ward and Jeffrey K. Liker, Sloan Management Review, Volume 40 #2, Winter 1999

Screen Beans Art, © A Bit Better Corporation

Thursday, 31 January 2002

Lazy Workers

Scientific Management
The workers on the first Ford assembly line spoke more than 50 languages, and many of them could barely speak English.[1] It was in this context that Frederick W. Taylor’s book, The Principles of Scientific Management, was published in 1911.[2]

Taylor believed that laborers were uneducated and lazy, reflecting the prevailing thinking of the time. To increase productivity, he proposed the ‘science’ of decomposing tasks into their smallest components, timing and planning each micro-task, and telling the worker exactly how to do each task. Taylor admitted that his methods were inappropriate for educated craftsmen or even intelligent laborers.[3]

Scientific Management was the beginning of the separation of planning from execution. Prior to Ford’s assembly line, automobiles were assembled and maintained by skilled craftsmen. Ford first developed interchangeable parts, then developed a method to have them assembled by interchangeable laborers. After all, Ford’s turnover was 380% in 1913, so it was necessary to give laborers a job they could learn in just a few minutes.

The NUMMI Experiment
In 1982, GM closed it’s Fremont plant, which had the worst productivity and absenteeism record in the company. In 1983, a Toyota and GM re-opened the same plant and hired back the same workers. New United Motor Manufacturing, Inc. (NUMMI) was managed by Toyota-trained management. They borrowed widely from Frederick Taylor in areas of work measurement, but with one major difference. Instead of industrial engineers, small work teams were formed and trained in work measurement and analysis methods. Workers designed their own jobs, and continually worked to improve their own performance. In two years, the same facility with the same workers was operating at twice the productivity and quality, better of any other GM plant. Absenteeism and drug abuse on the job had virtually disappeared, and the plant was being expanded.[4]

The Problem: Separation of Planning from Execution
Lean Production was the end of the separation of planning from execution. The fundamental change at the NUMMI plant was the involvement of the workers in the design and improvement of their own work. ‘Holding back knowledge and effort (has been) repeatedly noted by industrial sociologists as a salient feature of all mass-production systems.’[5] The critical difference in Lean Production was the direct engagement of the workers in improving the process.

Lean Production does not require extraordinary people and is certainly not without discipline. It is build on the principle of a learning environment, where small, educated teams work toward an objective using the basic scientific method: experiment, measure the results, see if it’s an improvement, and if it is, go with it, if not try something else. Don’t guess, gather data.

The fundamental difference between mass production and lean production is the separation of the planning activity from the execution activity. In the NUMMI plant, work planning was done by the workers, which resulted in an extremely short feedback loop that was continually correcting toward the desired set point. In the former GM plant, work planning was done by industrial engineers resulting in open loop control.

The Solution: Closed Loop Control
Similarly, Just-in-Time provides for work planning at the point of execution, with extremely short feedback loops overseen by the workers, who exercise ultimate control. Contrast this to MRP systems, which is divorced from the workers and provides open loop control (if it provides any control at all). These days, MRP systems are used as overall planning systems, while detailed scheduling is done with the work-level pull systems.

The only way to get closed loop control is to have workers plan the process as well as execute it. The separation of planning from execution comes from a paradigm which regards workers as uneducated and lazy. The integration of planning and execution recognizes that given the proper training, leadership and objectives, workers are more capable of designing and improving their processes than any unengaged organization, be it an industrial engineering office, a materials control office or a project office.
______________________
Footnotes:

1. The Machine That Changed the World : The Story of Lean Production, by Womack, James P., Daniel T. Jones, and Daniel Roos, New York: Rawson and Associates; 1990, page 31.

2. The Principles of Scientific Management, Taylor, Frederick W., first published as an essay in 1911, published by Harper & Brothers, New York, 1919, available as a Dover republication printed in 1998.

3. Taylor, Frederick W., Scientific Management - Comprising Shop Management, The principles of Scientific Management and Testimony before the Special House Committee, 1964, Harper and Row


4. “Time-and-Motion Regained”, Alder, Paul, Harvard Business Review (January-February, 1993) pp97-108.